Begin with the building use, project location and opening schedule. Separate fixed glazing from operable windows and doors, then identify where ventilation, access, mesh or cleaning requirements change the configuration.
Bring together the architect’s sightline and finish intent, glass requirements, preferred operation, hardware needs, receiving structure and installation access. A decision in one area can change what is appropriate elsewhere.
Ask for the complete assembly to be reviewed. Confirm which dimensions are indicative and which have been measured on site, who approves the system, and which performance requirements need documented evidence. Drawings and BOQs can be sent to Magnesta for an initial discussion.